(Additional photograph below.)
As Little River now flows almost unobstructed under Winter Street on its way to the Merrimack River, Haverhill officials this week will outline next steps for the dam removal and park project.
The city’s Conservation Department is having a public information session with officials, contractors and consultants this Saturday, Nov. 7, from 9-11 a.m., at Cashman’s Field, 175 Hilldale Ave., Haverhill.
Julianne Busa, senior project manager from Fuss & O’Neill, previewed plans during the summer of 2023.
“We’re also looking to increase river access and provide additional ways for people to get to the river, interact with the river, utilize the river and create some public greenspace and increased tree cover in the downtown area,” she explained.
Lucianos Excavation of Taunton bid $7.3 million to remove the early-1800s-era stone masonry dam.
As WHAV reported, the genesis of the dam removal dates back at least six years when Haverhill city councilors endorsed seeking money from the state’s Municipal Vulnerability Preparedness program to study its feasibility. At the time, officials cited upstream flooding along Apple Street and Little River Street, threats to natural habitat and encouraging nearby development as reasons.
Plans to redevelop the adjacent Pentucket Mill on Steven Street were unveiled by then-Mayor James J. Fiorentini in his State of the City address in 2016. As WHAV reported at the time, Winn Development proposed 80 units of housing with a restaurant on the first floor in the mill. Fiorentini said “the new development will have a public park, a walkway, to open Little River to the public in that area for the first time in a century.”
It became clear early on, redevelopment would not take place as long as Little River Dam remained in place as a possible liability. All plans evaporated entirely after last April’s three-alarm inferno destroyed the complex.
Consultants from Fuss & O’Neil told Haverhill residents in 2022 elimination of the dam, near Lafayette Square, will bring a cleaner waterway and improve recreational access. Haverhill has since received more than $4 million in state grants toward the originally estimated $6-9 million project. A year ago, the city took steps to secure and access adjacent land.
A 2023 tour detailed ideas for a pedestrian bridge behind Cashman Field, linking to a walking path along the opposite side of the river, and a planned canoe and kayak dock.
In case of rain, Saturday’s planned information session will be rescheduled to Saturday, Nov. 21. Hot beverages will be provided, MeVa Transit will drive attendees between the park and dam and a Spanish interpreter will be available.

Little River dam and falls in 2020 at Winter Street in Haverhill. (WHAV News photograph.)
