Motorists can expect Interstate 495 lane restrictions each night this week as preliminary work continues to replace two bridges over the Merrimack River between Haverhill and Methuen.
Travelers are advised to expect single and double lane closings each night, Monday through Friday, from 8 p.m. to 5 a.m., in the area of exits 105, Route 213, and 106, Ward Hill.
Stage 1 construction work entails clearing and grubbing operations and trestle construction in the Merrimack River to support bridge work. In addition, work on temporary traffic controls, such as line striping and roadway maintenance, will take place. Drivers are advised to reduce speeds and remain mindful of a modified lane configuration in the southbound direction.
